Breaking time-scale boundary: An optimization framework for improving multi-timescale operation characteristics of pumped storage power plant

Journal:
Applied Energy
Published:
Affiliations:
5
Authors:
8
Institutions Authors Share
Northwest A&F University (NWAFU), China
2.500000
0.31
MOE Key Laboratory of Agricultural Soil and Water Engineering in Arid and Semiarid Areas, NWAFU, China
2.500000
0.31
MWR China Institute of Water Resources and Hydropower Research (IWHR), China
1.000000
0.13
China Southern Power Grid Co., Ltd. (CSG), China
1.000000
0.13
Northumbria University, United Kingdom (UK)
1.000000
0.13