A bi-level multi-timescale scheduling approach to flexible operation of a coal-fired power plant with post-combustion CO2 capture facilitated by hollow fiber membrane contactors

Journal:
Energy
Published:
Affiliations:
1
Authors:
3
Institutions Authors Share
State Key Laboratory of Power System Operation and Control, Tsinghua, China
3.000000
1.00