Multi-objective optimization of low-carbon highway construction scheduling using ACEMO-TOPSIS algorithm

Journal:
Journal of Cleaner Production
Published:
Affiliations:
3
Authors:
4
Institutions Authors Share
Inner Mongolia University of Science and Technology (IMUST), China
3.000000
0.75
Chang'an University, China
1.000000
0.25